Our dynamic charts make it easy to get an up-to-date view of the Australia and New Zealand Infrastructure Pipeline. Pick one of the charts and filter by location, sector, status and procurement approach to explore the data behind the pipeline.
ANZIP charts
Major projects chart (coming soon) Infrastructure pipeline by status Infrastructure pipeline by locationAdditional charts by Infrastructure Partnerships Australia
Privatisations charts Public Private Partnerships chartPrivate Finance Analysis
Recent Updates
The New England Renewable Energy Zone (REZ) has a proposed capacity of 8,000 megawatts of generation. The REZ is to be located in the New England region, centred around Armidale.
The scope of works for each stage of the network expansion is yet to be identified.
The Aquila Wind Farm, proposed by ACEN Australia, is a wind generation and storage project to be located near Mount Aquila, approximately 70 kilometres southeast of Dubbo, NSW. The scope of the works includes:
- up to 48 wind turbines for a total capacity of 300 megawatts (MW)
- a battery energy storage system with 100 MW / 200 megawatt-hour (MWh) capacity
- connection to existing 330 kilovolt (kV) transmission lines
- permanent meterological monitoring masts, and
- temporary and permanent ancillary infrastructure required for the delivery of the project.
The Suburban Rail Loop (SRL) is a 90-kilometre rail loop of the Melbourne metropolitan area. SRL will connect to every major rail line from the Frankston Line to the Werribee Line. As a result, the SRL will transition Melbourne's rail network from its current radial status to an oribital network.
The Loop will consist of three sections:
- SRL East - Cheltenham to Box Hill
- SRL North - Box Hill to Melbourne Airport
- SRL West - Melbourne Airport to Werribee
The precincts to be connected by SRL include: Cheltenham, Clayton, Monash, Glen Waverley, Burwood, Box Hill, Doncaster, Heidelberg, Bundoora, Reservoir, Fawkner, Broadmeadows, Melbourne Airport, Sunshine and Werribee.
As well as providing a rail link to the airport, the project will also build three 'transport super hubs' at Clayton, Broadmeadows and Sunshine to connect regional passengers to the Suburban Rail Loop.
Given the scale of the Loop, construction is to be staged over several decades, with the SRL East and SRL North sections to be constructed first. The west section will be planned and constructed in conjunction with the Melbourne Metro Tunnel, Melbourne Airport Rail and the Western Rail Plan.
The SRL East and SRL North sections have a preliminary costing in the range of $30 to $50.5 billion. A timeline and estimated cost for the completion of SRL West has not been provided at this stage.
The first stage of the Suburban Rail Loop – SRL East – is a fully-tunnelled 26 kilometre metro corridor between Cheltenham in the South and Box Hill in the North. The line will include six stations, including new interchanges with existing heavy rail stations at Cheltenham, Clayton, Glen Waverley and Box Hill, with new stations at Monash and Burwood. The new interchange in Clayton will act as a 'transport super hub, connecting regional passengers to the Suburban Rail Loop.
The six underground stations will range from 17 to 23 metres below street level and will be built using a 'bottom-up' method. The location of the entrances will be near existing train stations and central amenities.
SRL East has been split into seven work packages:
- Works Package A: Initial and Early Works
- site establishment
- utility relocation and protection works
- road and traffic modifications
- tunnel Access Shaft structures
- drainage and civil works
- ground Improvement works, and
- temporary works and tram works
- Works Package B: Power Construction Supply Works
- connecting Suburban Rail Loop East to Victoria’s shared electricity network, and
- construction of onsite substations
- Works Package C: Cheltenham to Glen Waverley Tunnels
- tunnelling and cross passages between Cheltenham and Glen Waverley, and
- Clayton and Monash station box excavations, including temporary retaining structures
- Works Package D: Glen Waverley to Box Hill Tunnels
- tunnelling and cross passages between Glen Waverley and Box Hill
- Burwood and Glen Waverley station box excavations, including temporary retaining structures, and
- an intervention shaft structure
- Works Package E: Cheltenham to Glen Waverley Stations
- station building works at Cheltenham, Clayton and Monash
- station box excavation at Cheltenham, including temporary retaining structures
- all station work to complete stations, excluding work included in Works Package G, and
- surface work at station precincts
- Works Package F: Glen Waverley to Box Hill Stations
- station building works at Glen Waverley, Burwood and Box Hill
- station box excavation at Box Hill, including temporary restraining structures
- all station work to complete stations, excluding work included in Works Package G, and
- surface work at station precincts
- Works Package G: Linewide
- tunnel fit-out works
- cross passage fit-out
- permanent high and low voltage power supply
- traction power
- track sectioning equipment
- communication systems
- network control, including signalling
- rolling stock
- depot and maintenance facilities
- backup network control and disaster recovery centre
- overall responsibility for systems integration, and
- operations and maintenance.
The Tauriko Enabling Works include safety upgrades at intersections of State Highway 29 with Redwood Lane, Belk Road and Cambridge Road.
The Enabling Works form the initial stage of the Tauriko Network Plan, which includes the replacement of the SH29 Omanawa bridge, public transport prioritisation corridor improvements, a new SH29 and the revocation of the existing SH29.
The Tauriko Enabling Works include:
- a new intersection with traffic lights on SH29 at Tauriko Village to provide access to the northern part of Tauriko West
- widening of SH29 between the new intersection at Tauriko Village and Cambridge Road, including provision of a new shared walking and cycling path along the northern side of SH29
- an upgrade of the existing SH29/Cambridge Road intersection with traffic lights and a new connection to Whiore Avenue for buses, people walking and cycling only
- a new footpath along the southern side of Whiore Avenue and provision for future bus stops
- a new roundabout at SH29/Redwood Lane, which will connect to Tauriko Business Estate via Kaweroa Drive and provide access to the southern part of Tauriko West via Redwood Lane
- a new shared path connecting Redwood Lane to Kaweroa Drive crossing underneath SH29, and
- closure of the existing SH29/Belk Road intersection, with traffic redirected through Tauriko Business Estate to the new SH29/Redwood Lane roundabout.
The Government of Western Australia is exploring options to construct a new container port at Kwinana. This would see the eventual transfer of container handling capacity from Fremantle Port to the new Kwinana Port over time.
There are two preferred options for handling container freight over the transition between the Freemantle and Kwinana ports. Both ultimately result in all freight capacity shifting from Fremantle to Kwinana, and both require the construction of a new land-backed port in the Kwinana Industrial Area serviced by an upgraded Anketell Road freight route.
This project involves the delivery of 25 new X’Trapolis 2.0 trains for Melbourne's metropolitan network.
These new trains are expected to boost reliability of current services and accommodate additional services in future, driven by the pipeline of rail capital projects underway across Melbourne. New rolling stock is expected also enable the ageing trains on the network to be retired by 2030.
The new trains are expected to have a minimum 60 per cent local content requirement, and be manufactured in Alstom's Ballarat facility.
The project also involves an upgrade to the Craigieburn Train Maintenance Facility, allowing the new trains to be efficiently housed and maintained.
The Queensland Government has announced the delivery of a 19 kilometre dual track from Beerwah to Caloundra.
This is the first stage of the proposed 37-kilometre Direct Sunshine Coast Rail Line which would extend the Brisbane to Sunshine Coast Rail Line to the Maroochydore CBD, via the Caloundra and Maroochydore Corridor Options Study corridor.
The project was formerly titled the Beerwah to Maroochydore Rail Extension.
The Whaleback Ridge Renewable Energy Project, located around Lake Pieman near Zeehan in western Tasmania, will involve the establishment of up to 500 wind turbine generators, with a projected generating capacity of 3,000 megawatts (MW).
The proponent, Westcoast Renewable Energy, has identified a wide area of turbine exclusion zones. The Project includes the development of collector substations, access roads, office and workshop facilities, installation of overhead and underground transmission lines, and the use of mobile concrete batching plants.
The project will be staged to meet demand in the market and capacity on the transmission network, with an expectation that all project stages are likely to be constructed and operational by 2040, depending on market demand.
Learn how to make the most of ANZIP
Welcome to the Australian and New Zealand Infrastructure Pipeline platform, a search tool for infrastructure projects. The Beta version offers new exciting features as well as improved popular features like Map view. Simply go to 'Search' in the menu bar to access the map.