Snowy 2.0




PROJECT
PIPELINE
STATUS

Prospective pipeline

Credibly proposed

Announced

Under procurement

Preferred bidder announced

Recently closed
Snowy 2.0
STATUS

Prospective pipeline

Greenfield (construction) or brownfield (government asset divestment) projects needed or likely to occur within the next five years, but is not formally proposed by a state, territory or major local government.

Credibly proposed

The project or divestment is supported by a state, territory or major local government, is subject to studies or other processes (such as pre-feasibility or scoping studies or business case development), and is likely to proceed to formal announcement.   

Announced

The project has a firm commitment and timeline from a state, territory or major local government, but has not yet entered the market.

Under procurement

The project or transaction is under procurement (such as a call for Expressions of Interest, requests for tender, or another offer to the market).

Preferred bidder announced

A preferred bidder has been selected and is in exclusive negotiations.

Recently closed

Projects that have progressed to contractual close remain on ANZIP for 12 months.

ANZIP is focused only on major infrastructure activity, above the following thresholds:

Australia

Construction projects: > AUD$300m

Investable greenfield & brownfield: > AUD$100m

New Zealand

All greenfield and brownfield projects and divestments: > NZD $100 million


STATUS: Credibly proposed
VALUE: $4.15bn AUD
SECTOR: Energy
JURISDICTION: Commonwealth
PROCUREMENT APPROACH: Traditional procurement
TYPE: Greenfield

The Snowy 2.0 project is a proposed expansion of the existing Snowy Hydro Scheme, in the Snowy Mountains region. The Federal Government first proposed the expansion project in March 2017 and a feasibility study was commissioned.

The $29 million feasibility study, which was largely completed by the engineering firm SMEC, was approved by Snowy Hydro's Board of Directors in December 2017.

The preliminary cost estimate of the expansion project is $3.8 - $4.5 billion, with up to an additional $2 billion required to upgrade the transmission lines from the Snowy Mountains to Sydney and Melbourne, which will likely be funded from electricity network charges.

In March 2018, the Federal Government announced it had reached an agreement with the NSW and Victorian state governments, taking on full ownership of their respective shares in Snowy Hydro Limited. Snowy Hydro Limited was previously 58 per cent owned by NSW, 29 per cent by Victoria and 13 per cent by the Federal Government. A Federal Government buyout of Snowy Hydro Limited was first proposed in mid-2017. The agreed fair market value of the enterprise is $7.8 billion, which saw NSW receive $4.154 billion and Victoria $2.077 billion.

Following the completion of the buyout, the NSW Government declared Snowy 2.0 as State Significant Infrastructure (SSI). Applications for SSI are subject to consultation and an environmental impact assessment in accordance with NSW Government standards.

Snowy 2.0 is expected to increase generation capacity by 2,000 megawatts, which will power approximately 500,000 homes at peak demand. It would require the construction of a 26 kilometre tunnel that links the Tantangara Reservoir to Talbingo Reservoir, to be built up to 800 metres underground.

The project has an expected six year construction period, which would conclude in 2024.

Further work will be undertaken by Snowy Hydro to determine a final investment decision in 2018.



Last reviewed: 23/03/2018