Waurn Ponds Duplication project - Stage 2




PROJECT
PIPELINE
STATUS

Prospective pipeline

Credibly proposed

Announced

Under procurement

Preferred bidder announced

Recently closed
Waurn Ponds Duplication project - Stage 2
STATUS

Prospective pipeline

Greenfield (construction) or brownfield (government asset divestment) projects needed or likely to occur within the next five years, but is not formally proposed by a state, territory or major local government.

Credibly proposed

The project or divestment is supported by a state, territory or major local government, is subject to studies or other processes (such as pre-feasibility or scoping studies or business case development), and is likely to proceed to formal announcement.   

Announced

The project has a firm commitment and timeline from a state, territory or major local government, but has not yet entered the market.

Under procurement

The project or transaction is under procurement (such as a call for Expressions of Interest, requests for tender, or another offer to the market).

Preferred bidder announced

A preferred bidder has been selected and is in exclusive negotiations.

Recently closed

Projects that have progressed to contractual close remain on ANZIP for 12 months.

ANZIP is focused only on major infrastructure activity, above the following thresholds:

Australia

Construction projects: > AUD$300m

Investable greenfield & brownfield: > AUD$100m

New Zealand

All greenfield and brownfield projects and divestments: > NZD $100 million


STATUS: Prospective pipeline
VALUE: $736M AUD
SECTOR: Rail
JURISDICTION: VIC, Commonwealth
PROCUREMENT APPROACH: Alliance
TYPE: Greenfield

Stage 2 of the Waurn Ponds Duplication project will see the duplication of the Geelong rail line between South Geelong and Waurn Ponds stations, increasing the capacity of the line to accommodate population growth.

In FY2016-17 the Victorian and Federal Governments allocated funding towards the $4 million South Geelong to Waurn Ponds Planning Project, which developed the business case for the project by examining signalling and asset upgrade options along the rail corridor, including the South Geelong tunnel.

In May 2018 the business case was submitted to Infrastructure Australia (IA) for consideration. The project is expected to comprise:

  • duplication of 13 kilometres of track between Waurn Ponds and South Geelong;
  • removal of level crossings at Fyans Street and Surf Coast Highway; and
  • upgrades to South Geelong and Marshall train stations

 

A business case for Stage 3 - to improve the 400-metre-long South Geelong tunnel bottleneck - will also be developed through the project.

In the lead up to the 2018 Victorian State Election the Victorian Government announced that it would provide $147 million towards the project if re-elected, while seeking the remaining $589 million from the Federal Government's National Rail Program. The Federal Government committed $150 million towards the Duplication in its 2017-18 and 2018-19 Budgets.

The Victorian Government has indicated that it expects construction of the project to begin in 2020 and be completed by 2023.

Stage 1 of the project is the $160 million Geelong Line Upgrade that is part of the Regional Rail Revival program of works being managed by Rail Projects Victoria. The Upgrade will see:

  • a second platform and pedestrian link at Waurn Ponds station’
  • a passing loop at Waurn Ponds; and
  • corridor planning for a connection to Armstrong Creek from Marshall station.

 

Site investigations for the Upgrade are underway. Expressions of Interest (EOIs) were called for in October 2018. Works are expected to commence in 2020 and be completed by 2021.

In August 2018 IA released their project evaluation of Waurn Ponds Duplication project Stage 2, finding the project had a Benefit Cost Ratio of 0.6 and therefore did not add the project to its Infrastructure Priority List.

IA also noted from the business case that:

  • the Victorian Government's preferred procurement method is through an Alliance contract,
  • the business case recommends Stage 1 and Stage 2 works be packaged together and delivered as part of the Regional Rail Revival program, and
  • the Victorian Government would explore funding the project through alternative funding sources such as a Growth Areas Infrastructure Charge, in addition to grant funding

 

More broadly, IA lists Melbourne – Geelong rail capacity enhancement as a Long Term (10-15 year) Priority Initiative on its Infrastructure Priority List. Infrastructure Victoria notes in it's 30 year strategy that the duplication of the Geelong Line between South Geelong and Waurn Ponds is an example of its recommended Regional rail upgrades.  



Last reviewed: 12/10/2018