North Harbour 2 Watermain
STATUS

Prospective pipeline

Greenfield (construction) or brownfield (government asset divestment) projects needed or likely to occur within the next five years, but is not formally proposed by a state, territory or major local government.

Credibly proposed

The project or divestment is supported by a state, territory or major local government, is subject to studies or other processes (such as pre-feasibility or scoping studies or business case development), and is likely to proceed to formal announcement.   

Announced

The project has a firm commitment and timeline from a state, territory or major local government, but has not yet entered the market.

Under procurement

The project or transaction is under procurement (such as a call for Expressions of Interest, requests for tender, or another offer to the market).

Preferred bidder announced

A preferred bidder has been selected and is in exclusive negotiations.

Recently closed

Projects that have progressed to contractual close remain on ANZIP for 12 months.

ANZIP is focused only on major infrastructure activity, above the following thresholds:

Australia

Construction projects: > AUD$300m

Investable greenfield & brownfield: > AUD$100m

New Zealand

All greenfield and brownfield projects and divestments: > NZD $100 million



STATUS: Recently closed
VALUE: $247.3M AUD | $264M NZD
SECTOR: Water & sewerage
JURISDICTION: New Zealand
PROCUREMENT APPROACH: Alliance
TYPE: Greenfield

Watercare is progressing plans for the North Harbour 2 Watermain project, which involves the installation of a new watermain conveying portable drinking water from Auckland’s western water sources in the Waitakere Ranges to west-Auckland, North Shore and Rodney. In addition to increasing capacity in the water supply network, the new watermain will also allow the existing North Harbour 1, which transmits water from Titirangi to the North Shore, Whangaparaoa and Orewa, to be repaired without disrupting the water supply.

The watermain will be 33 kilometres in length and 1.2 metres in diameter. It will be located on existing road reserves, primarily along or adjacent to the State Highway 18 motorway corridor.

Construction on the project, is set to occur in stages between 2018 and 2026.

Watercare has already obtained resource consents for a small section of pipe that runs next to State Highway 18 and under the Greenhithe Bridge, which will be built first, as the existing pipe requires repairs. Watercare is continuing to progress other designation and consenting applications for the project.



Last reviewed: 01/10/2019