Argoon Wind Farm is a proposed generation and storage project proposed to be located near Murrumbidgee, NSW. The scope of the works includes:
- up to 106 wind turbines with a total capacity of 901 megawatts (MW), and a maximum height of 249 metres (to blade tip)
- a 330-kilovolt (kV) substation with a 330-kV overhead transmission line connecting the Project to grid via the proposed Dinawan Substation
- a battery energy storage system with a 460 MW / 2.3 gigawatt hour capacity, and
- permanent and temporary ancillary infrastructure.
Key Dates
| Nov 2023 | Project Announcement |
Procurement
| Procuring Agency: | RES Energy |
PROJECT HISTORY
| Nov 2023 | A scoping report and request for the Secretary's Environmental Assessment Requirements was published for the project. |
| Dec 2023 | The NSW Government issued the Secretary's Environmental Assessment Requirements for the project. |
| Jan 2025 | The project was submitted to the EPBC Portal for assessment. |
| May 2025 | The NSW Government issued updated SEARs for the project. |
Estimated Total Cost
(2023)
Sector
Energy
Procurement approach
Other |
Location
New South Wales |