The Clean Energy Link - East Project is a proposed 330-kilovolt (kV) and 132-kV transmission line and terminal builds within the existing network, which will connect Western Power’s existing Shotts and Muja Terminals in Collie to Darkan. Work will also include existing line conversions and reinforcement work.
The Shotts Terminal and Transmission package includes:
- an expansion of the existing Shotts Terminal near Collie
- a 38-kilometre double-circuit 330 kV transmission line between Shotts Terminal and Cordering Terminal, and
- a 54-kilometre double-circuit 330 kV transmission line between Muja Terminal and Cordering Terminal.
Key Dates
| Oct 2026 | Contract Award |
| 2027 | Expected Construction Commencement |
Procurement
| Procuring Agency: | Western Power |
| Successful Tenderer: | UGL |
PROJECT HISTORY
| Oct 2026 | The Western Australian Government announced that UGL had been awarded the contract to deliver the project. |
Estimated Total Cost
(2026)
Sector
Energy
Procurement approach
Construct Only |
Location
Western Australia |