The Doughboy Wind Farm is a proposed generation and storage project to be located approximately 40 kilometres northeast of Armidale, NSW. The scope of the works includes:
- 55 turbines with a total generation capacity of 340 megawatts (MW)
- a substation and transmission connection linking the turbines to the existing Transgrid 330 kV transmission line
- a battery energy storage system of up to 100 MW / 400 MW hour capacity, and
- temporary and permanent ancillary infrastructure.
Procurement
Procuring Agency: | Ark Energy |
PROJECT HISTORY
Oct 2023 | The proponent lodged a Request for the Secretary's Environmental Assessment Requirements (SEARs). |
Nov 2023 | SEARs were issued for the project. |