The Morwell BESS is a proposed 620 MW / 2.5 GWh Battery Energy Storage System to be located in the Latrobe Valley in South-East Victoria. The project is being developed by TagEnergy.
The scope of work includes delivery and installation of BESS units and transformers, enabling infrastructure and connection to the existing Hazelwood Terminal Station.
Procurement
| Procuring Agency: | TagEnergy |
PROJECT HISTORY
| Aug 2025 | TagEnergy acquired early-stage project developer ACE Power and adopted development rights for the project. |
| Oct 2025 | The project was submitted to the Victorian Minister for Planning for development approval. |
| May 2026 | The project was granted development approval through the Victorian Development Facilitation Process. |
Estimated Total Cost
(2026)
Sector
Energy
Procurement approach
Unconfirmed |
Engineering, Procurement and Construction (EPC) |
Location
Victoria |