The Pilbara Green Link is a proposed expansion to the North-West Interconnected System, linking the existing network to the Australian Renewable Energy Hub and other major generation projects.
The project would include the installation of approximately 550 kilometres of 330-kilovolt transmission lines and associated infrastructure.
In addition, the proposed transmission link will connect to existing iron ore mines in the Pilbara region to facilitate decarbonisation of the sector.
Key Dates
| Sep 2024 | EOIs Open |
Procurement
| Procuring Agency: | Horizon Power |
| Procurement note: | The project is being tendered in two works pattern, Link 1, being 275 kilometres of transmission line and one substation, and Link 2, being 300 kilometres of transmission line and the other substation.
The contract is being delivered through a fixed lump sum price Engineering, Procurement, Construction (EPC) contract selected through Early Contractor Involvement (ECI). |
| Related contracts: |
PROJECT HISTORY
| Jul 2024 | GHD has been engaged to provide preliminary engineering services for the proposed Pilbara Green Link project. |
| Sep 2024 | Horizon Power called for Expressions of Interest for the delivery of the Pilbara Green Link. The project was to be delivered through an Early Contractor Involvement and procured through two separate work packages. Horizon Power also announced that the project will be developed in conjunction with the Australia Renewable Energy Hub through a Special Purpose Vehicle. |
| Mar 2025 | The project was included in the Federal Government's inaugural Renewable Energy Priority List. The Priority List aims to provide coordinated support through Federal, state and territory regulatory and environmental approval processes on a case-by-case basis and provide a 'faster to yes, faster to no' approach to regulatory approvals. |