Sydney Metro – West – Parramatta Enabling Works

PROJECT STATUS
Under Procurement
Sydney Metro – West – Parramatta Enabling Works

The Parramatta Enabling Works Package for Sydney Metro West will be delivered ahead of the Tunnel and Excavation – Western Package. The Parramatta Enabling Works package includes the following scope of works: 

Demolition work consisting of:

  • a multi-level car park, 13 buildings and redundant substations
  • protection of properties adjacent to the site, and 
  • protection and retention of two heritage listed properties within the site.

Utilities work consisting of:

  • decommissioning and removal of five substations and installation of one new switching station
  • cut and cap of a gas pipe
  • decommissioning of all utility connections to buildings to be demolished
  • relocation of a fibre optic cable, and
  • heritage and archaeology investigations related to utility relocations.

Internal roadworks consisting of:    

  •     construction of two public access roads, and
  •     heritage and archaeology investigations related to roadworks.

Key Dates

Feb 2021 EOIs Open
Sep 2022 Expected Contract Award
Jun 2023 Expected Construction Commencement
Dec 2024 Expected Construction Completion

Procurement

Procuring Agency: Sydney Metro

PROJECT HISTORY

Oct 2020 The Package was announced as part of the Transport for NSW's Transport Infrastructure Pipeline 2025. The potential delivery type for the package was noted as a Design and Construct contract.
Feb 2021 The NSW Government, through Sydney Metro, opened Expressions of Interest for Pre-Qualification for the Sydney Metro West – Parramatta Enabling Works package. An industry briefing was held on 5 February.
Estimated Total Cost
(2021)
Sector
Rail
Procurement approach
Traditional Procurement | Unconfirmed |
Location
New South Wales |
Resources
Tender notices
2021/02/02
Project pages
Sydney Metro West