The Warradarge Solar Farm is a proposed solar generation and battery storage facility, to be located south-east of Eneabba, WA within the existing Warradarge Wind Farm development area.
The proposed project includes:
- a solar farm with a generation capacity of 500 megawatts (MW), and
- a 500-MW BESS
The project is being developed by Synergy Red.
Key Dates
| Sep 2026 | Project Announcement |
Procurement
| Procuring Agency: | SynergyRED |
PROJECT HISTORY
| Sep 2026 | Synergy Red submitted an application for Development Approval to the Shire of Coorow for assessment. |
| Sep 2026 | Synergy Red submitted the project to the Western Australian EPA Portal for environmental assessment. |
Sector
Energy
Procurement approach
Design and Construct (D&C) |
Location
Western Australia |
Resources