Project

Yathroo Wind Farm

PROJECT STATUS
Detailed Planning
Yathroo Wind Farm

The Yathroo Wind Farm is by Neoen Australia and would be located approximately 8km south of Dandaragan and 8km north of Regans Ford in Western Australia.

The project comprises up to 65 wind turbines with a generation capacity of up to 500MW, alongside a proposed battery energy storage system with a capacity of up to 400MW/3.2GWh. The project would connect to the South West Interconnected System via the existing 330/132kV transmission line near the site, which is planned to be upgraded by Western Power to a dual-circuit 330kV line.

PROJECT HISTORY

Oct 2023 The Shire of Dandaragan granted development approval for the project.
Feb 2026 The WA EPA determined that environmental assessment would not be required as part of the EP Act.
Feb 2026 The Federal Government granted approval under the Environment Protection and Biodiversity Conservation Act (Cth)1999.
May 2026 The project was selected under Western Australia’s Capacity Investment Scheme Tender Round 5 for renewable generation and Tender Round 6 for dispatchable capacity.
Estimated Total Cost
(2026)
Sector
Energy
Procurement approach
Unconfirmed |